Comparing the 3D model, the Line List and issued isometrics
Analysis of the contractor’s design: discrepancies between the model, the line list and the issued drawings surface before construction
During project execution, KRIDIUM supports contractor oversight and commissioning readiness. In operations, it supports maintenance, procurement, modifications, compliance and audits
These are not theoretical capabilities. They are based on reports and analyses requested by owner project teams on active large-scale projects
Analysis of the contractor’s design: discrepancies between the model, the line list and the issued drawings surface before construction
Checking that piping matches equipment nozzles where piping and flange standards differ
The contractor’s report showed a multiple overstatement of joint inspection work
A significant overstatement by the contractor was found — up to 50% on some diameters
Source data for LoRaWAN and PLTE radio planning by production block
It is clear which structures must be erected to place equipment and piping, without searching through structural drawings
The basis for ordering lifting equipment and planning rigging work
Issuing work fronts to site and controlling physical volumes from data rather than scans
A list of tags and documents per system plus visualisation: equipment grouped by construction area to control commissioning
Building the commissioning database and preparing checklists without manual archive work
Workload planning, data analysis and population of the maintenance system’s equipment database for fixed-asset planning
It is visible which equipment is bought under an order and how it links to specifications and project items
| Operational Challenge | How KRIDIUM helps | Business Outcome |
|---|---|---|
| Sudden shutdown of critical equipment | Finding drawings and connection diagrams, access to repair instructions, locating spare-part suppliers | Downtime cut by 40–60% |
| Planned line upgrade | Analysis of current equipment characteristics, selection of compatible units, source data for load calculations | Justified upgrade investment |
| New engineers joining | Individual learning paths, maintenance history, VR training on the unit | Shorter onboarding |
| Coordinating adjacent units | Comparing technical requirements, analysing connection points, coordinating maintenance schedules | Production bottlenecks removed |
| Slow procurement procedures | Analysis of replacement frequency, alternative suppliers, purchase volume calculation | Faster preparation of purchase specifications |
| Equipment replacement planning | Source data for life-cycle calculation and replacement options | Justified investment planning |
| Regulatory compliance check | Reconciling characteristics with requirements, preparing reports, spotting non-conformities | Inspections passed without issues |
| Building a digital twin | Integrating data into the 3D model, testing changes virtually, optimising planning | Lower risk when implementing changes |
Fast search for documents and equipment, collecting specifications and spare-part data, planning maintenance on current data
Analysis and reporting for management decisions, visual reports on the 3D model, personnel training based on the model and VR
Building tag and document lists per system and subsystem, showing outlines on the 3D model, controlling commissioning operations
Current data, as-built documentation and the 3D model for the designer to estimate effort in revamps and expansions
The link between design need, equipment and purchase items: how much to buy, maintain and start up
Risk identification and assessment on engineering data, what-if scenarios, criticality ranking of equipment