Risk and value

Data Gaps become Project and Operational Costs

When engineering data management is not established early, the costs do not disappear - they are simply pushed downstream into construction, commissioning and operations, where resolving them becomes significantly more expensive

Risk Exposure

The Business Impact of Poor Engineering Data

Risks grouped by order of potential damage — from one million dollars to a hundred million and above

$100 m and above of Potential Financial Exposure
  • Downtime risk from poor maintenance planning on an incomplete equipment database
  • Reliability analysis and RCM-based maintenance forecasting become impossible
  • Poor design decisions caused by an underdeveloped 3D model
$10 m of Potential Financial Exposure
  • Missed deadlines in the spare-part campaign for four years of operation
  • Risk of accepting defective equipment
  • Under-stocked spares for critical equipment during commissioning and the first years
  • Data starvation in operations systems: the maintenance system, reliability systems
$1 m of Potential Financial Exposure
  • High effort to create equipment and piping passports after start-up
  • High effort searching for information during repairs and revamps
  • Unused spare-part stock and no record of what actually arrived
  • No documentation for packaged units down to individual equipment items
  • Reputational damage from missing or poor-quality information
Industry data

What open sources show

Estimates from industry research and the practice of industrial companies: what the absence of managed engineering data costs

up 11 %
of annual revenue is lost by a large facility on unplanned downtime alone
$ 500 000
and more is the cost of one hour of emergency shutdown in petrochemicals and heavy industry
42 %
of emergency shutdowns are caused by equipment issues, and most of them are preventable
up 1 %
of CAPEX is what poor information management costs: $10 m of direct losses on a $1 bn budget

The company pays twice

First for building the facility, then for manually collecting, checking and restoring information that should have emerged along the way. Without a system, a dedicated team of 40–60 people works for one to two years just to populate equipment databases

Data cannot be recovered afterwards

Information not captured from the start of design has to be reconstructed retrospectively — in practice three to five times more expensive, and some of it disappears together with the contractor and its subcontractors

Sources: Fiatech (Construction Industry Institute) and IDC (Feldman et al., 2005) research, industry statistics on unplanned downtime and the practice of delivered mega-projects

Mitigation

How the key risks are actually closed

Red-zone riskHow it is solvedBusiness effect
Downtime from maintenance planning on an unreliable equipment databaseUniform requirements and templates for early data delivery in contractor agreements; validation in KRIDIUM from the EP phase, findings corrected at the contractor’s expenseEarly equipment database and readiness for an early start-up
Missed spare-part procurement campaignDigitisation of vendor documentation packages for automatic generation of spare-part bills of material−30% effort on data preparation, −40% data errors
Acceptance of defective equipmentEarly equipment database built from contractor data validated against numbering, class and reference valuesLess verification effort before loading, smoother workload
High passportisation effortContractors required to break packaged deliveries down to individual items and to deliver the characteristics needed for passportsEquipment and piping passports generated automatically from data
Economics

A four-year project calculation

On the left, the cost of managing data without a system; on the right, the cost of KRIDIUM including the support service. The difference on a single project is up to $4 m

ItemWithout KRIDIUM, $ mWith KRIDIUM, $ m
Cost of searching for information1—
Contractor entering data into the equipment database2—
In-house effort to collect data4—
Additional IT costs1—
Infrastructure—1
Software licences—1
Engineering data support service—2
Total63
up to $4 m
up to $4 m of direct difference on a single investment project
$7 m
two-year potential on the direct cost of data preparation
40 employees
the team that would otherwise work 1–2 years just to populate databases

The calculation is based on the costs of a delivered mega-project and on the equipment and standards database costs of a comparable project. Sources: comparative labour analysis, Fiatech (Construction Industry Institute) and IDC (Feldman et al., 2005) research. USD figures rounded up independently to the nearest million.