The process

Effective Asset Data Management starts with the Process

Asset data management is more than a software platform. It requires clearly defined rules for what data is delivered, when it is delivered, how it is validated, who is responsible, and how non-conformities are resolved

A Unified Engineering Data Warehouse cannot be deployed on a project where the corresponding business process does not exist or does not work. The minimum condition is a set of standards for object naming, 3D modelling, and document numbering and classification

Our team has the experience and competencies to develop and implement the methodologies KRIDIUM needs to work on your project

Object naming standard

Rules for tag naming and numbering: a single identifier for the functional location and the equipment item that survives from design to decommissioning

3D modelling standard

Requirements for developing and controlling the 3D model: scope, accuracy, element naming rules and the link between geometry, tags and documents

Document numbering and classification

One system of document identifiers and types, letting every document be linked to a specific object, system and life-cycle stage

The flow

From Contractor Deliverables to Trusted Engineering Data

The cycle repeats throughout the project: data is accepted regularly, checked against formal criteria and returned to the contractor with findings until it is fit for operations

Contractorsand vendorsE, EP, EPC contractorsEquipment vendorsSubcontractorsRegulardeliveryAt least every two monthsThrough the document systemA 1D · 2D · 3D packageKRIDIUMValidation and linkingCompletenessIntegrityAccuracyNaming consistencyValidated dataProject web portal: search, object cardsreports, the 3D modelConsuming systemsMaintenance system, ERP, commissioning database,MES, the digital twinA formal report on errors and missing data — within the regulated period,before the acceptance certificate is signed. Clarifications and weekly sessionsData delivery is tiedto the project payment milestones
What is checked

One Quality Framework across 1D, 2D and 3D Data

1D — engineering data registers

Functional locations, equipment items, classes and characteristics. Checked against the project data management and reference data guidelines

2D — documents and diagrams

Documents, P&ID, passports and datasheets. Checked against the document numbering and classification standard or the project specifications

3D — facility models

3D models of the units. Checked against the 3D model development and control standard, including the link between geometry and tags

Completeness
Consistency
Accuracy
Naming Compliance
Associated information together
Roles and Responsibilities

Clear Ownership across the Engineering Data Process

The process works only when data responsibilities are formally defined in contracts - not left to informal agreements

RoleKey ResponsibilitiesFrequency
The owner’s data management teamRequirements and standards, data acceptance and validation, formal findings, contractor training, user access to validated dataContinuous, clarification sessions once or twice a week
EP / EPC contractorDelivering data in the owner’s templates, internal quality control, passing requirements down to subcontractors and manufacturers, correcting findings at its own expenseAt least every two months, monthly during the active phase
Equipment vendors and manufacturersData and documentation for packaged deliveries, broken down to individual equipment items and the characteristics needed for passportsAccording to the delivery and acceptance schedule
Project managementIncluding data requirements in contracts from day one and tying data delivery to payment milestonesAt the contract preparation stage
The owner’s project officeMonitoring compliance with tagging rules in documentationContinuously during project execution
Getting Started

Establishing Asset Data Management on your Project

If an engineering data management process is not yet in place, we establish it around the specific requirements of your project - from an initial maturity assessment to a fully operational data acceptance workflow

  1. Maturity Assessment

    We assess which standards and processes already exist, where data is lost and what contractual requirements are in force

  2. Standards Development

    Tag naming and numbering, the classifier and reference data, 3D model requirements, document numbering and classification

  3. Contractual Data Requirements

    Appendices to EP / EPC contracts and technical conditions: data scope, templates, delivery deadlines, links to payment milestones

  4. Process & Platform Launch

    Configuring KRIDIUM for the project information standard, training contractors, the first acceptance and findings cycles

Roll-out stages and standards →