Roll-out

The system, the process and the contracts as one package

It is not only a platform: the information standard, the regulations, the roles and the contractual data requirements come with it

When to start

Asset Data Management starts before EPC

The engineering data team scales up gradually and works on the project alongside the contractors

  1. Feasibility / Concept Stage

    One specialist agrees engineering data requirements with contractors while the EBD/FEED contract is being prepared — at the invitation-to-tender stage

  2. EBD / FEED

    The team collects and validates engineering data against specification requirements; KRIDIUM and the document workflow are deployed from the EBD/FEED stage

  3. EPC Execution

    Regular acceptance of contractor data, user training, report and integration configuration, preparing data for handover to consuming systems

  4. Operations

    Keeping data current through the change management process, user training, report and dashboard configuration

Engineering data requirements are included in all investment project contracts by default, starting from the EBD/FEED stage

Process

Accepting contractor data

The cycle repeats monthly, so errors are corrected long before start-up rather than on the last day before handover

  1. Agreeing requirements

    Requirements for the scope and quality of data are agreed with contractors and vendors before the contract is signed

  2. Regular delivery

    Data arrives through the document management system at least every two months, and monthly during the active phase

  3. Validation

    KRIDIUM checks completeness, integrity, accuracy and naming consistency, linking 1D, 2D and 3D together

  4. Formal response

    A list of errors and missing data goes back to the contractor through the official channel within the regulated period — before the acceptance certificate is signed, with clarifications and weekly sessions

  5. Access to validated data

    Validated data is opened to project users through the web portal and passed on to consuming systems

Contractual Requirements

Making Engineering Data a Contractual Deliverable

If engineering data requirements are not defined contractually, contractors have no clear obligation to deliver information in the structure, format and quality required by the owner

  • Engineering data means all data subject to numbering under the project numbering procedure
  • All equipment is classified according to the classifier in the reference data specification
  • Each class has a list of characteristics that are mandatory to fill in and to deliver
  • The contractor passes the owner’s requirements down to subcontractors, vendors and manufacturers
  • The contractor accepts and controls its subcontractors’ data and, failing that, produces the data itself
  • Data is delivered at least every two months — so errors are fixed long before start-up
  • Delivery of engineering data is tied to the project payment milestones
  • The contractor uses the owner’s templates and maintains internal data quality control
  • The owner holds clarification sessions with contractors once or twice a week
Standards

The methodology the owner keeps

Seven corporate standards, mandatory for all large-budget and mega-projects, operate at the customer on the basis of this approach

Implementation Roadmap

A Phased Approach from Governance to Operations

Phase 0 - Governance & Standards · 7 months

Forming the engineering data team, developing standards, agreeing requirements and contract appendices with contractors

Phase 1 - Platform Deployment · 10 months

Deploying the platform, configuring the information standard, setting up contractor interaction, pilot production and roll-out assessment

Phase 2 - Engineering Data Acceptance

Regular acceptance of EP+C phase data, assessment of data completeness and quality, system improvements driven by users

Phase 3 - Enterprise Integrations · 12 months

Integration project with consuming systems: the maintenance system, MES and real-time data systems

Phase 4 - Operations

Handing the system over to operations and introducing the change management process — over a 50-year asset horizon

Scaling out

Extending the standard and the system to other sites in the group’s investment programme

Operations

Management of Change after Start-up

The plant’s information stays reliable only if every change goes through the same loop as the project data

Type of workWhat the data team does
Maintenance and repairBuilding the 1D-2D-3D package, checking it against information standards, populating the equipment database, breaking down to spare parts, datasheets
Small projectsThe same plus preparing and optimising the technical assignment from existing data, correcting the equipment and spare-part database
Revamp, upgrade, expansionBuilding the package and checking standards compliance, preparing the as-built package on project completion