Phase 0 - Governance & Standards · 7 months
Forming the engineering data team, developing standards, agreeing requirements and contract appendices with contractors
It is not only a platform: the information standard, the regulations, the roles and the contractual data requirements come with it
The engineering data team scales up gradually and works on the project alongside the contractors
One specialist agrees engineering data requirements with contractors while the EBD/FEED contract is being prepared — at the invitation-to-tender stage
The team collects and validates engineering data against specification requirements; KRIDIUM and the document workflow are deployed from the EBD/FEED stage
Regular acceptance of contractor data, user training, report and integration configuration, preparing data for handover to consuming systems
Keeping data current through the change management process, user training, report and dashboard configuration
Engineering data requirements are included in all investment project contracts by default, starting from the EBD/FEED stage
The cycle repeats monthly, so errors are corrected long before start-up rather than on the last day before handover
Requirements for the scope and quality of data are agreed with contractors and vendors before the contract is signed
Data arrives through the document management system at least every two months, and monthly during the active phase
KRIDIUM checks completeness, integrity, accuracy and naming consistency, linking 1D, 2D and 3D together
A list of errors and missing data goes back to the contractor through the official channel within the regulated period — before the acceptance certificate is signed, with clarifications and weekly sessions
Validated data is opened to project users through the web portal and passed on to consuming systems
If engineering data requirements are not defined contractually, contractors have no clear obligation to deliver information in the structure, format and quality required by the owner
Seven corporate standards, mandatory for all large-budget and mega-projects, operate at the customer on the basis of this approach
Forming the engineering data team, developing standards, agreeing requirements and contract appendices with contractors
Deploying the platform, configuring the information standard, setting up contractor interaction, pilot production and roll-out assessment
Regular acceptance of EP+C phase data, assessment of data completeness and quality, system improvements driven by users
Integration project with consuming systems: the maintenance system, MES and real-time data systems
Handing the system over to operations and introducing the change management process — over a 50-year asset horizon
Extending the standard and the system to other sites in the group’s investment programme
The plant’s information stays reliable only if every change goes through the same loop as the project data
| Type of work | What the data team does |
|---|---|
| Maintenance and repair | Building the 1D-2D-3D package, checking it against information standards, populating the equipment database, breaking down to spare parts, datasheets |
| Small projects | The same plus preparing and optimising the technical assignment from existing data, correcting the equipment and spare-part database |
| Revamp, upgrade, expansion | Building the package and checking standards compliance, preparing the as-built package on project completion |